Now that the walls are built up to 1st floor level they were being prepared for the wall pour. This is when the concrete is poured into the cavity between the ICF blocks. First of all the final touches were made to the walls.

 

Then the lorry with the concrete arrived and set up ready for the pour of the concrete. This whole arm extends off the back of the lorry and can reach over 20m. It carries a tube through which the concrete is pumped.

The walls were filled. You can see the seepage around the bottom of the blocks. This is mostly water leaking around the blocks.

Now we just have to wait for the concrete to set and the walls will be secure. Here is our first floor just about finished.