On the 21st April 2008 the lorry arrived carrying the initial materials to site.
The build is being done using ICF (integrated Concrete Forms). These are foam blocks which provide massive thermal insulation into which they pour concrete for strength and rigidity.
Below left you can see the floor blocks and the wall blocks in the other photos.


Here you can see the actual foam blocks with the space in between to hold the concrete. The walls will be 50cm (18 inches) thick and have a thermal value of 0.1 w/m2. This is compared to a normal brick and block construction which gives values of about 0.3. I believe the current building regulations are for a value of 0.26, so we exceed this - even up to the proposed zero carbon standard in 2016.

The house will be so thermally efficient that there is no formal heating system in the house - just an air heat exchanger, and this runs at a cost of about £50 a year. That's heating for a 300m2 house for £50!